/>
Teamcenter resources

Nuclear company case study: An ITAR compliance implementation journey

July 29, 2025

Discover how a U.S. Nuclear company built one of the most secure Teamcenter environments in the energy sector.

Operating in a highly regulated, ITAR-bound industry, this nuclear company needed more than just a PLM system; it needed a scalable, secure, and future-ready digital foundation. With help from Applied CAx, they rapidly deployed a robust Teamcenter environment, integrated advanced simulation and requirements tools, and empowered internal teams through hands-on training and mentorship. The result? A resilient platform supporting full lifecycle traceability, supplier collaboration and model-based systems engineering.

 

Download the case study to see how they did it, and what your organization can learn from their approach.

 

You’ll learn how this nuclear company:

  • Achieved a rapid PLM rollout with integrated change management, simulation, and requirements tracking-all within a tightly regulated, ITAR-compliant environment.
  • Built a scalable digital thread foundation to support long-term innovation, model-based systems engineering, and secure supplier collaboration.
  • Empowered internal teams through structured training, mentorship and strategic enablement to ensure long-term system adoption and sustainability.

Download the case study

It’s time to unleash your potential

Reach out to the team at Applied CAx to learn how our solutions can make your company’s goals achievable.